Nyköping Skavsta (SE)

The Synthetic Site Folder and Site Brief are available for free.
Please register and login to access the Complete Site Folder.

Data

NYKOPING SKAVSTA (SE)

Scales XL/L

Team representative Architect, urban planner and landscape architect
Location Skavsta Airport, Nyköping - Sörmland
Population 58 000 inhabitants

Reflection site 324 ha - Project site 28 ha

Site proposed by Nyköping Municipality
Actors involved Explore Skavsta, Nyköping Municipality, Region Sörmland
Owner(s) of the site Explore Skavsta, Nyköping Municipality

Commission after competition The prize winning team(s) will continue the work with the competition assignment in a workshop with the municipality, with an option for further work towards an implementation of the proposal, including workshops, various planning documents, illustrations, drawings and citizen dialogues.

More Information

Inhabited milieu's challenges

Skavsta – today known for its international airport – is located in a strategic position, seven km from Nyköping and about 100 km south of the City of Stockholm city, approximately 1/3 of Sweden’s population can be reached within 100 km.
Stockholm Skavsta Airport was historically an important military airbase, F11. Of local interest are also the ancient bronze settlements along the nearby protected cultural landscape of Nyköpingsån.The site is today mostly surface car parking and unbuilt land.
The construction of the East Link, a new national railway line, with a station planned next to the airport will make Skavsta a unique intermodal node in Sweden.This gives the opportunity for the area to be developed, to create a resilient and self-sufficient area where working, commuting, travelling, services and recreation are interwoven through solutions that encourage creativity and innovation.
Due to the noise levels from the airport, permanent housing is not suitable at Skavsta. Skavsta can however provide space for the establishment and growth of new companies. One of the biggest challenges is that the separation between the working and housing functions, the focus on efficiency, flows and costs optimization in the design of the buildings often results in business areas being experienced as dead. Transportation hubs have a high requirement for design, with a focus on efficiency, flows and capacity.
An initial structural plan has been approved by the municipality, pinpointing the strategic elements that will organize the new area. Skavsta Square, the link to the transport hub, Skavsta Boulevard, the area’s main street, and the Park. The new physical structure needs to accommodate blocks that allow the clustering of companies in different scales and the flexibility to be developed in different stages, as well as innovative logistic business.

Questions to the competitors

With the vision of “Innovative Skavsta a unique, resilient and self-sufficient area for a clustering of companies” the goal is to forecast a development for the next 20 years.
Some factors are key for it to happen successfully:
A carefully modulated space for commuters/travellers, a common and uninterrupted space which can support a smooth everyday travel experience. How can that space meet both the needs of the people commuting and the travellers arriving at the airport? How can such a living environment be created with urban planning and architecture as tools? Which structures bring people closer together? How can the central public square be reinvented for this context?
When it comes to the physical structure for future companies and industries in the area, how can the familiar concepts be challenged to support innovation in a multitude of ways? What does innovation mean for the physical structure? When it comes to energy, the area has the reachable goal to become self-sufficient. It also implies new ways of promoting social and ecological aspects in the living environment. How can a unique, resilient, and self-sufficient structure be reinvented? How can it support the clustering of future companies in such way that new synergies are created between them?
Old ideas about how all the strategic elements that will organize the development are designed should be challenged to create something unique. The proposal should explore the spatial and functional qualities of the public square. How can the components of the transportation hub be interwoven into a whole living environment? How do we find co-use and all-day use of the area as opposed to a large and empty space? How can the views and needs of children be considered in transportation hubs, where the efficiency of the transport is often the focus? How can the green structure be integrated into the square? What impact can people’s behaviours and lifestyles have on the physical environment? How can greenery, recreation and stormwater management be integrated into the public space in a new way?

Questions on the site

DWG and DXF files do not include information on z axis, which means that all altitude lines are not placed in their actual height ( all altitude lines are placed on +1m). Could you complete the site folder with a cad model including the site altitudes?

In the DXF file called SE-Nykoping-PS-M2, the contour lines are placed in the right height. The coordinate z can be found under the property "elevation"

Concerning the Skavsta airport, what is the future placement of the existing parking (the one that is part od the projekt site) in relation to a mobility study

  • The existing parking on the project site is mostly serving the airport. This parking will essentially be located to the north of the future railway – see the pdf document now available on the Complete site folder in the folder "0-New-Documents-After-Launch"
  • For a mobility study the priority order (walking, biking, public transport, car traffic) is important. In the red marked roads – see the pdf document now available on the Complete site folder in the folder "0-New-Documents-After-Launch" – for main car traffic access gives a hint for the location of future car parking (common parking garages included).  

 

Concerning the expansion plan of the airport, is a future plan to reach maximum capacity? Today the airport capacity is up to 3 million passengers/year whereas the permit is for 6 million passenger/year. 

The main purpose is not to prevent the future development of the airport. Explore Skavsta wants to increase the air traffic and, in the long run, possibly reach the maximum capacity.

During the visit the forest land being a cultivated forest industry land was discussed. That was also obvious by observing the heights and the regular distances of the trees. In the brief it is stated that this land is natural forest. What does natural mean in that case? Who is the owner of this property? How old are the trees and are they suitable for wood construction?

-        “Natural forest” is not a precise term in the brief. In this case it also includes “cultivated forest industry land”, as you rightly have observed.

-        The land owner of the project site is foremost Explore Skavsta. As they are partners for this competition, we see no need for taking exact ownership into account on this stage. 

-        The age of the trees on the project site differs.  We can assume that they are suitable for wood construction.

Concerning F11 area, is it possible to share with us some material for the future development of the F11 area to get an idea of the direction of future Skavsta?

-        The plans for the F11 area are still in progress. We only have the planning program as an overarching document for this area. It assumes a different kind of development compared to the other parts of future Skavsta. We can assume a small scale development with the exception of the area next to the railway, where a larger scale development is possible. Possible activities according to the planning program are: education, high school, conference, temporary accommodation, innovation business, etc. In the area connected to the airport related businesses might develop, including spaces for authorities. Explore Skavsta as land owner has some current actions for this area, but the outcome is not yet official.

-        The F11 area will be connected to the greater Skavsta despite the railway barrier.

Is it possible to get sections through the future train station, in order to understand the relation with the public square that is going to be designed close by?

A digital model of the platform building (station) is not available for us. We only have preliminary renderings of the concept design given in the brief. The brief also gives the ground level of the entrance to the platform building (+47 meter), which is essential for the relation to the public square and surrounding areas. 

In order to give some further information from the concept design: 

-        ground level of the bridge over the platforms: ca +52 meter

-        ground level of the platforms (by the railway): ca +45 meter

-        In order to make a basic model of the platform building see the PDFs: “platform building plan 1-500” and “platform building section 1-100”, now available on the Complete site folder in the folder "0-New-Documents-After-Launch". In the same folder you can find two new pictures to better understand the concept design.

General heights of the train line crossing Skavsta are also relevant for the proposal to be integrated strategically (taking into account the need of noise control caused by train). Can we get some more information about that?

-        The height of the railway line will be corresponding to the ground level of the platforms (by the railway): +45 meter.

-        General noise protection will be part of the East Link Project. The difference in ground level will help the protection.

 

This site is connected to the following theme

THINK TABULA NON-RASA!
Designing new habitats as a holistic environment

Some nature reserves around the world are deserts –hot or cold–, but they host all kinds of animals and microorganisms hiding in the cracks and crevices, under the rocks. Some of our sites look empty, vacant, but they are not. They are full of life: in the soil, in the air, in the breeze. They are part of a larger balance of natural forces and processes. On these sites, substantial new volumes of programme are required. Think of these sites as the opportunity to multiply the number of life forms, think of the request to build new habitats as an opportunity to design a holistic environment. Think tabula non-rasa!

Specific documents

E17_SE_Nyköping_Site_visit_map.png

Questions on the site

You have to be connected –and therefore registered– to be able to ask a question.

Fr. 2 June 2023
Deadline for submitting questions

Fr. 16 June 2023
Deadline for answers

Before submitting a question, make sure it does not already appear in the FAQ.

Please ask questions on sites in the Sites section.
Please ask questions on rules in the Rules section.

If your question does not receive any answer in 10 days, check the FAQ to make sure the answer does not appear under another label or email the secretariat concerned by the question (national secretariat for the sites, European secretariat for the rules).

Europan notebooks

Every 3 months find out more information and articles about what is happening in Europan.*

Register here to receive them by email.

*Europan is an European network of architectural, urban planning and landscape ideas competitions for young designers who take care of inhabited milieus, and followed by implementation processes